Settlement correction work for tilt. - List of Manufacturers, Suppliers, Companies and Products | IPROS

Settlement correction work for tilt. Product List

1~1 item / All 1 items

Displayed results

Blocking liquefaction risk in existing homes | Settlement correction work for narrow lots

Preventing liquefaction settlement in narrow residential areas with the i-LIFT method and digital measurement. Safe horizontal restoration with low noise and construction while living.

As a liquefaction countermeasure for existing homes in narrow sites or densely populated residential areas where the transportation of large heavy machinery is difficult, Geotech offers a pre-subsidence prevention and correction solution using the "i-LIFT method." This method involves the precise injection of quick-setting cement-based grout into the soft sandy layers directly beneath the building using ultra-compact, easily transportable specialized equipment, gradually achieving the formation of a support layer, foundation reinforcement, and millimeter-level lift-up. By utilizing high-precision digital 3D displacement sensors and laser levels, we visualize and monitor the behavior of the building in real-time during construction, correcting it to a perfect horizontal state without placing excessive stress on adjacent houses or structures. Since large-scale demolition or excavation is unnecessary, the construction can be completed while the homeowner remains in their familiar residence, accommodating "construction while living." Through thorough low-noise, low-vibration, and space-saving construction practices, we enhance the seismic resistance and structural safety of the home permanently while preventing neighborhood disputes.

  • others
  • Settlement correction work for tilt.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration